Hy2Gen Phase 2 (L0614)

Hy2Gen Phase 2 is a 380.0 MW other interconnection project in Cowlitz, Washington with a current status of withdrawn. It is proposed to connect at Longview Substation.

380.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameHy2Gen Phase 2
Queue IDL0614
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity380.0 MW
StateWashington
CountyCowlitz
Point of interconnectionLongview Substation
Requested (queue) date2024-06-25
Proposed in-service date2027-06-27
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata