Hydro (482)

Hydro is a 1.3 MW other interconnection project in Rutland, Vermont with a current status of withdrawn. It is proposed to connect at GMP Power Circuit 85G2 from Ryegate Paper Substation No. 85..

1.3 MWCapacity
WithdrawnStatus
VTMarket
OtherTechnology

Project facts

Canonical nameHydro
Queue ID482
Statuswithdrawn
Source statusW
MarketVT
TechnologyOther
Capacity1.3 MW
StateVermont
CountyRutland
Point of interconnectionGMP Power Circuit 85G2 from Ryegate Paper Substation No. 85.
Requested (queue) date2014-11-18
Proposed in-service date2014-12-12
Operational date
Withdrawn date2015-01-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata