Hyundai Load (L0631)

Hyundai Load is a 200.0 MW other interconnection project with a current status of active. It is proposed to connect at Lane Substation or Eugene-Alvey No 2 115kV line.

200.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameHyundai Load
Queue IDL0631
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity200.0 MW
State
CountyLane
Point of interconnectionLane Substation or Eugene-Alvey No 2 115kV line
Requested (queue) date2024-10-02
Proposed in-service date2027-10-04
Operational date
Withdrawn date
DeveloperEugene Water & Electric Board
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.