IA Queue Project GI-5 — Wind in Page County, Iowa
IA Queue Project GI-5 — Wind in Page County, Iowa is a 50.0 MW wind interconnection project in Page County, Iowa with a current status of withdrawn. It is proposed to connect at Northboro 69 kV Bus.
50.0 MWCapacity
WithdrawnStatus
IAMarket
WindTechnology
Project facts
| Canonical name | IA Queue Project GI-5 — Wind in Page County, Iowa |
|---|---|
| Queue ID | GI-5 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | IA |
| Technology | Wind |
| Capacity | 50.0 MW |
| State | Iowa |
| County | Page County |
| Point of interconnection | Northboro 69 kV Bus |
| Requested (queue) date | 2006-02-07 |
| Proposed in-service date | 2011-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Associated Electric Cooperative, Inc. |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata