Iberdrola Renewables Inc (G111)

Iberdrola Renewables Inc is a 200.0 MW wind interconnection project in Klickitat, Washington with a current status of withdrawn. It is proposed to connect at On Midway – Big Eddy 230 kV Line, 8 mi SW of Bickleton.

200.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameIberdrola Renewables Inc
Queue IDG111
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity200.0 MW
StateWashington
CountyKlickitat
Point of interconnectionOn Midway – Big Eddy 230 kV Line, 8 mi SW of Bickleton
Requested (queue) date2002-11-04
Proposed in-service date2004-03-01
Operational date
Withdrawn date
DeveloperAvangrid Power, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata