ID Queue Project 700 — Solar+Battery in Ada, Idaho
ID Queue Project 700 — Solar+Battery in Ada, Idaho is a 200.0 MW solar+battery interconnection project in Ada, Idaho with a current status of withdrawn. It is proposed to connect at MORA–BOBN 138kV Line.
200.0 MWCapacity
WithdrawnStatus
IDMarket
Solar+BatteryTechnology
Project facts
| Canonical name | ID Queue Project 700 — Solar+Battery in Ada, Idaho |
|---|---|
| Queue ID | 700 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | ID |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Idaho |
| County | Ada |
| Point of interconnection | MORA–BOBN 138kV Line |
| Requested (queue) date | 2023-01-09 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata