ID Queue Project 710 — Solar+Battery in Ada, Idaho

ID Queue Project 710 — Solar+Battery in Ada, Idaho is a 200.0 MW solar+battery interconnection project in Ada, Idaho with a current status of active. It is proposed to connect at DRAM–RTSN 230kV Line.

200.0 MWCapacity
ActiveStatus
IDMarket
Solar+BatteryTechnology

Project facts

Canonical nameID Queue Project 710 — Solar+Battery in Ada, Idaho
Queue ID710
Statusactive
Source statusActive
MarketID
TechnologySolar+Battery
Capacity200.0 MW
StateIdaho
CountyAda
Point of interconnectionDRAM–RTSN 230kV Line
Requested (queue) date2023-03-24
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10phaseRfTCSDGIAlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata