ID Queue Project 724 — Battery in Canyon, Idaho
ID Queue Project 724 — Battery in Canyon, Idaho is a 100.0 MW battery interconnection project in Canyon, Idaho with a current status of active. It is proposed to connect at Bowmont 230kV Substation.
100.0 MWCapacity
ActiveStatus
IDMarket
BatteryTechnology
Project facts
| Canonical name | ID Queue Project 724 — Battery in Canyon, Idaho |
|---|---|
| Queue ID | 724 |
| Status | active |
| Source status | Active |
| Market | ID |
| Technology | Battery |
| Capacity | 100.0 MW |
| State | Idaho |
| County | Canyon |
| Point of interconnection | Bowmont 230kV Substation |
| Requested (queue) date | 2023-06-09 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-10 | phase | RfTCS | DGIA | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.