ID Queue Project 772 — Battery in Elmore, Idaho

ID Queue Project 772 — Battery in Elmore, Idaho is a 300.0 MW battery interconnection project in Elmore, Idaho with a current status of withdrawn. It is proposed to connect at Mayfield 500kV Substation.

300.0 MWCapacity
WithdrawnStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameID Queue Project 772 — Battery in Elmore, Idaho
Queue ID772
Statuswithdrawn
Source statusDeemed Withdrawn
MarketID
TechnologyBattery
Capacity300.0 MW
StateIdaho
CountyElmore
Point of interconnectionMayfield 500kV Substation
Requested (queue) date2025-04-03
Proposed in-service date2030-01-24
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-17statusactivewithdrawnhigh
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.