ID Queue Project 782 — Wind in Bingham, Idaho
ID Queue Project 782 — Wind in Bingham, Idaho is a 199.0 MW wind interconnection project in Bingham, Idaho with a current status of active. It is proposed to connect at Knoll-Goshen 345kV Line Tap.
199.0 MWCapacity
ActiveStatus
IDMarket
WindTechnology
Project facts
| Canonical name | ID Queue Project 782 — Wind in Bingham, Idaho |
|---|---|
| Queue ID | 782 |
| Status | active |
| Source status | Active |
| Market | ID |
| Technology | Wind |
| Capacity | 199.0 MW |
| State | Idaho |
| County | Bingham |
| Point of interconnection | Knoll-Goshen 345kV Line Tap |
| Requested (queue) date | 2025-04-14 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-31 | status | withdrawn | active | high |
| 2026-08-31 | phase | FSA | FS | low |
| 2026-08-10 | status | active | withdrawn | high |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.