ID Queue Project 813 — Battery in Jerome, Idaho
ID Queue Project 813 — Battery in Jerome, Idaho is a 300.0 MW battery interconnection project in Jerome, Idaho with a current status of withdrawn. It is proposed to connect at Hunt 230kV Substation.
300.0 MWCapacity
WithdrawnStatus
IDMarket
BatteryTechnology
Project facts
| Canonical name | ID Queue Project 813 — Battery in Jerome, Idaho |
|---|---|
| Queue ID | 813 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | ID |
| Technology | Battery |
| Capacity | 300.0 MW |
| State | Idaho |
| County | Jerome |
| Point of interconnection | Hunt 230kV Substation |
| Requested (queue) date | 2026-04-13 |
| Proposed in-service date | 2028-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-17 | phase | CRW | — | low |
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata