ID Queue Project 814 — Solar+Battery in Lincoln, Idaho
ID Queue Project 814 — Solar+Battery in Lincoln, Idaho is a 199.0 MW solar+battery interconnection project in Lincoln, Idaho with a current status of active. It is proposed to connect at Midpoint 345kV Substation.
199.0 MWCapacity
ActiveStatus
IDMarket
Solar+BatteryTechnology
Project facts
| Canonical name | ID Queue Project 814 — Solar+Battery in Lincoln, Idaho |
|---|---|
| Queue ID | 814 |
| Status | active |
| Source status | Active |
| Market | ID |
| Technology | Solar+Battery |
| Capacity | 199.0 MW |
| State | Idaho |
| County | Lincoln |
| Point of interconnection | Midpoint 345kV Substation |
| Requested (queue) date | 2026-04-14 |
| Proposed in-service date | 2030-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-17 | phase | CSR | — | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.