ID Queue Project 817 — Battery in Power County, Idaho
ID Queue Project 817 — Battery in Power County, Idaho is a 200.0 MW battery interconnection project in Power County, Idaho with a current status of active. It is proposed to connect at Brady 230kV Substation.
200.0 MWCapacity
ActiveStatus
IDMarket
BatteryTechnology
Project facts
| Canonical name | ID Queue Project 817 — Battery in Power County, Idaho |
|---|---|
| Queue ID | 817 |
| Status | active |
| Source status | Active |
| Market | ID |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | Idaho |
| County | Power County |
| Point of interconnection | Brady 230kV Substation |
| Requested (queue) date | 2026-04-15 |
| Proposed in-service date | 2031-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-17 | phase | CSR | — | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata