ID Queue Project G0502 — Other in Elmore, Idaho

ID Queue Project G0502 — Other in Elmore, Idaho is a 600.0 MW other interconnection project in Elmore, Idaho with a current status of withdrawn. It is proposed to connect at New substation and new transmission line to be built and located on the current Anderson Ranch Dam to Mountain Home, Idaho 115kV BPA line right of way..

600.0 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology

Project facts

Canonical nameID Queue Project G0502 — Other in Elmore, Idaho
Queue IDG0502
Statuswithdrawn
Source statusWITHDRAWN
MarketID
TechnologyOther
Capacity600.0 MW
StateIdaho
CountyElmore
Point of interconnectionNew substation and new transmission line to be built and located on the current Anderson Ranch Dam to Mountain Home, Idaho 115kV BPA line right of way.
Requested (queue) date2014-11-22
Proposed in-service date2017-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata