ID Queue Project G0502 — Other in Elmore, Idaho
ID Queue Project G0502 — Other in Elmore, Idaho is a 600.0 MW other interconnection project in Elmore, Idaho with a current status of withdrawn. It is proposed to connect at New substation and new transmission line to be built and located on the current Anderson Ranch Dam to Mountain Home, Idaho 115kV BPA line right of way..
Project facts
| Canonical name | ID Queue Project G0502 — Other in Elmore, Idaho |
|---|---|
| Queue ID | G0502 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ID |
| Technology | Other |
| Capacity | 600.0 MW |
| State | Idaho |
| County | Elmore |
| Point of interconnection | New substation and new transmission line to be built and located on the current Anderson Ranch Dam to Mountain Home, Idaho 115kV BPA line right of way. |
| Requested (queue) date | 2014-11-22 |
| Proposed in-service date | 2017-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata