ID Queue Project PIS001 — Solar+Battery in Clark, Idaho is a 200.0 MW solar+battery interconnection project in Clark, Idaho with a current status of withdrawn. It is proposed to connect at Amps substation.

200.0 MWCapacity
WithdrawnStatus
IDMarket
Solar+BatteryTechnology

Project facts

Canonical nameID Queue Project PIS001 — Solar+Battery in Clark, Idaho
Queue IDPIS001
Statuswithdrawn
Source statusWithdrawn
MarketID
TechnologySolar+Battery
Capacity200.0 MW
StateIdaho
CountyClark
Point of interconnectionAmps substation
Requested (queue) date2021-04-21
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata