ID Queue Project TCS-17 — Battery in Kootenai, Idaho

ID Queue Project TCS-17 — Battery in Kootenai, Idaho is a 200.0 MW battery interconnection project in Kootenai, Idaho with a current status of withdrawn. It is proposed to connect at Rathdrum 230kV Station.

200.0 MWCapacity
WithdrawnStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameID Queue Project TCS-17 — Battery in Kootenai, Idaho
Queue IDTCS-17
Statuswithdrawn
Source statusWithdrawn
MarketID
TechnologyBattery
Capacity200.0 MW
StateIdaho
CountyKootenai
Point of interconnectionRathdrum 230kV Station
Requested (queue) date2021-06-16
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.