Idaho Power Company-Power Supply (753)

Idaho Power Company-Power Supply is a 59.0 MW battery interconnection project in Twin Falls, Idaho with a current status of operational. It is proposed to connect at Milner Substation.

59.0 MWCapacity
OperationalStatus
IDMarket
BatteryTechnology

Project facts

Canonical nameIdaho Power Company-Power Supply
Queue ID753
Statusoperational
Source statusIn Service
MarketID
TechnologyBattery
Capacity59.0 MW
StateIdaho
CountyTwin Falls
Point of interconnectionMilner Substation
Requested (queue) date2025-01-08
Proposed in-service date
Operational date
Withdrawn date
DeveloperIdaho Power Company—Power Supply
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.