Imo 138 kV Sub (GEN-2016-033)

Imo 138 kV Sub is a 82.3 MW solar interconnection project in Johnston, Oklahoma with a current status of withdrawn. It is proposed to connect at Imo 138 kV Sub.

82.3 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameImo 138 kV Sub
Queue IDGEN-2016-033
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity82.3 MW
StateOklahoma
CountyJohnston
Point of interconnectionImo 138 kV Sub
Requested (queue) date2016-03-31
Proposed in-service date
Operational date
Withdrawn date2016-07-25
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.