Increase RISEC Winter CNR (544)
Increase RISEC Winter CNR is a 613.0 MW gas interconnection project in Providence, Rhode Island with a current status of operational. It is proposed to connect at 115 kV RISE substation.
613.0 MWCapacity
OperationalStatus
RIMarket
GasTechnology
Project facts
| Canonical name | Increase RISEC Winter CNR |
|---|---|
| Queue ID | 544 |
| Status | operational |
| Source status | C |
| Market | RI |
| Technology | Gas |
| Capacity | 613.0 MW |
| State | Rhode Island |
| County | Providence |
| Point of interconnection | 115 kV RISE substation |
| Requested (queue) date | 2015-03-03 |
| Proposed in-service date | — |
| Operational date | 2015-08-17 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata