Increase RISEC Winter CNR (544)

Increase RISEC Winter CNR is a 613.0 MW gas interconnection project in Providence, Rhode Island with a current status of operational. It is proposed to connect at 115 kV RISE substation.

613.0 MWCapacity
OperationalStatus
RIMarket
GasTechnology

Project facts

Canonical nameIncrease RISEC Winter CNR
Queue ID544
Statusoperational
Source statusC
MarketRI
TechnologyGas
Capacity613.0 MW
StateRhode Island
CountyProvidence
Point of interconnection115 kV RISE substation
Requested (queue) date2015-03-03
Proposed in-service date
Operational date2015-08-17
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata