Independence II Solar Farm (61588_1)

Independence II Solar Farm is a 4.1 MW solar interconnection project in Jackson, Missouri with a current status of operational.

4.1 MWCapacity
OperationalStatus
SWPPMarket
SolarTechnology

Project facts

Canonical nameIndependence II Solar Farm
Queue ID61588_1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologySolar
Capacity4.1 MW
StateMissouri
CountyJackson
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-06-01
Withdrawn date
Developer
Utility / transmission ownerMC Power Companies Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata