Industrial Park (L0427)
Industrial Park is a 120.0 MW other interconnection project in Kootenai, Idaho with a current status of withdrawn. It is proposed to connect at Bell-Taft 500kV #1, Mile 77 Tower 4 OR Lancaster 230kV Substation.
120.0 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | Industrial Park |
|---|---|
| Queue ID | L0427 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ID |
| Technology | Other |
| Capacity | 120.0 MW |
| State | Idaho |
| County | Kootenai |
| Point of interconnection | Bell-Taft 500kV #1, Mile 77 Tower 4 OR Lancaster 230kV Substation |
| Requested (queue) date | 2017-12-14 |
| Proposed in-service date | 2020-12-14 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Kootenai Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata