Internal Combustion (538)

Internal Combustion is a 119.4 MW gas interconnection project in Newport, Rhode Island with a current status of withdrawn. It is proposed to connect at Near Bell Rock and Somerset on NGRID 115kV lines L14 and M13. Adjacent to existing Tiverton combined cycle generator, possibly associated with existing tap..

119.4 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameInternal Combustion
Queue ID538
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity119.4 MW
StateRhode Island
CountyNewport
Point of interconnectionNear Bell Rock and Somerset on NGRID 115kV lines L14 and M13. Adjacent to existing Tiverton combined cycle generator, possibly associated with existing tap.
Requested (queue) date2015-03-02
Proposed in-service date2019-05-31
Operational date
Withdrawn date2016-04-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata