Internal noncontrollable ETU - interface upgrade (738)

Internal noncontrollable ETU - interface upgrade is a 400.0 MW generation interconnection project in Cumberland, Maine with a current status of withdrawn.

400.0 MWCapacity
WithdrawnStatus
MEMarket
GenerationTechnology

Project facts

Canonical nameInternal noncontrollable ETU - interface upgrade
Queue ID738
Statuswithdrawn
Source statusW
MarketME
TechnologyGeneration
Capacity400.0 MW
StateMaine
CountyCumberland
Point of interconnection
Requested (queue) date2018-04-12
Proposed in-service date2019-11-30
Operational date
Withdrawn date2020-11-30
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.