Iron Star Wind Project (64003_WTG1)

Iron Star Wind Project is a 297.6 MW wind interconnection project in Ford, Kansas with a current status of operational.

297.6 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameIron Star Wind Project
Queue ID64003_WTG1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity297.6 MW
StateKansas
CountyFord
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-12-01
Withdrawn date—
Developer—
Utility / transmission ownerEngie North America

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata