IRVINGTON - WEBSTER 345.0kV (J3808)

IRVINGTON - WEBSTER 345.0kV is a 300.0 MW wind interconnection project in Webster, Iowa with a current status of withdrawn. It is proposed to connect at IRVINGTON - WEBSTER 345.0kV.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameIRVINGTON - WEBSTER 345.0kV
Queue IDJ3808
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateIowa
CountyWebster
Point of interconnectionIRVINGTON - WEBSTER 345.0kV
Requested (queue) date2024-04-16
Proposed in-service date2028-05-01
Operational date2028-05-01
Withdrawn date2025-09-30
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.