ITC 161kV Wever Substation (J1471)

ITC 161kV Wever Substation is a 200.0 MW solar interconnection project in Lee County, Iowa with a current status of withdrawn. It is proposed to connect at ITC 161kV Wever Substation.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameITC 161kV Wever Substation
Queue IDJ1471
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateIowa
CountyLee County
Point of interconnectionITC 161kV Wever Substation
Requested (queue) date2019-04-29
Proposed in-service date2022-08-01
Operational date2022-08-01
Withdrawn date2022-02-21
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.