ITC 161kV Windsor - Hazleton 161kV Line (J1467)

ITC 161kV Windsor - Hazleton 161kV Line is a 150.0 MW wind interconnection project in Fayette County, Iowa with a current status of withdrawn. It is proposed to connect at ITC 161kV Windsor - Hazleton 161kV Line.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameITC 161kV Windsor - Hazleton 161kV Line
Queue IDJ1467
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity150.0 MW
StateIowa
CountyFayette County
Point of interconnectionITC 161kV Windsor - Hazleton 161kV Line
Requested (queue) date2019-04-29
Proposed in-service date2022-08-01
Operational date2022-08-01
Withdrawn date2021-03-24
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata