ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation (J1126)

ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation is a 1.1 MW wind interconnection project in Tuscola County, Michigan with a current status of withdrawn. It is proposed to connect at ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation.

1.1 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation
Queue IDJ1126
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity1.1 MW
StateMichigan
CountyTuscola County
Point of interconnectionITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2018-11-01
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata