J Strom Thurmond (3323_4)

J Strom Thurmond is a 51.7 MW other interconnection project in McCormick, South Carolina with a current status of operational.

51.7 MWCapacity
OperationalStatus
SEPAMarket
OtherTechnology

Project facts

Canonical nameJ Strom Thurmond
Queue ID3323_4
Statusoperational
Source status(OP) Operating
MarketSEPA
TechnologyOther
Capacity51.7 MW
StateSouth Carolina
CountyMcCormick
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1953-01-01
Withdrawn date
Developer
Utility / transmission ownerUSCE-Savannah District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata