Jackpot Holdings, LLC (517)
Jackpot Holdings, LLC is a 20.0 MW solar interconnection project in Twin Falls, Idaho with a current status of operational. It is proposed to connect at Midpoint–Humboldt 345kV Line.
20.0 MWCapacity
OperationalStatus
IDMarket
SolarTechnology
Project facts
| Canonical name | Jackpot Holdings, LLC |
|---|---|
| Queue ID | 517 |
| Status | operational |
| Source status | In Service |
| Market | ID |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Idaho |
| County | Twin Falls |
| Point of interconnection | Midpoint–Humboldt 345kV Line |
| Requested (queue) date | 2016-07-21 |
| Proposed in-service date | — |
| Operational date | 2016-12-31 |
| Withdrawn date | — |
| Developer | Jackpot Holdings, LLC |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata