Jamestown - Center 345kV Line (J940)

Jamestown - Center 345kV Line is a 100.0 MW wind interconnection project in Burleigh County, North Dakota with a current status of withdrawn. It is proposed to connect at Jamestown - Center 345kV Line.

100.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameJamestown - Center 345kV Line
Queue IDJ940
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity100.0 MW
StateNorth Dakota
CountyBurleigh County
Point of interconnectionJamestown - Center 345kV Line
Requested (queue) date2017-06-16
Proposed in-service date2019-09-15
Operational date2019-09-15
Withdrawn date2019-02-06
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata