Jasper Solar (IC-707)

Jasper Solar is a 160.0 MW solar interconnection project in Jasper County, Mississippi with a current status of operational.

160.0 MWCapacity
OperationalStatus
MSMarket
SolarTechnology

Project facts

Canonical nameJasper Solar
Queue IDIC-707
Statusoperational
Source status
MarketMS
TechnologySolar
Capacity160.0 MW
StateMississippi
CountyJasper County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata