Jasper Solar (IC-707)
Jasper Solar is a 160.0 MW solar interconnection project in Jasper County, Mississippi with a current status of operational.
160.0 MWCapacity
OperationalStatus
MSMarket
SolarTechnology
Project facts
| Canonical name | Jasper Solar |
|---|---|
| Queue ID | IC-707 |
| Status | operational |
| Source status | — |
| Market | MS |
| Technology | Solar |
| Capacity | 160.0 MW |
| State | Mississippi |
| County | Jasper County |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Mississippi Power Co |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata