Jaton (1059)

Jaton is a 16.2 MW solar interconnection project in Oswego, New York with a current status of withdrawn. It is proposed to connect at South Oswego - Clay 115 kV.

16.2 MWCapacity
WithdrawnStatus
CMarket
SolarTechnology

Project facts

Canonical nameJaton
Queue ID1059
Statuswithdrawn
Source status0
MarketC
TechnologySolar
Capacity16.2 MW
StateNew York
CountyOswego
Point of interconnectionSouth Oswego - Clay 115 kV
Requested (queue) date2020-07-31
Proposed in-service date2024-02-29
Operational date
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.