Jericho Wind expansion (437)

Jericho Wind expansion is a 3.5 MW wind interconnection project in Coos, New Hampshire with a current status of operational. It is proposed to connect at PSNH Berlin Substation Bus 1 Breaker 3521..

3.5 MWCapacity
OperationalStatus
NHMarket
WindTechnology

Project facts

Canonical nameJericho Wind expansion
Queue ID437
Statusoperational
Source statusC
MarketNH
TechnologyWind
Capacity3.5 MW
StateNew Hampshire
CountyCoos
Point of interconnectionPSNH Berlin Substation Bus 1 Breaker 3521.
Requested (queue) date2014-02-10
Proposed in-service date
Operational date2016-01-23
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.