Jim Bridger (8066_2)

Jim Bridger is a 586.2 MW gas interconnection project in Sweetwater, Wyoming with a current status of operational.

586.2 MWCapacity
OperationalStatus
PACEMarket
GasTechnology

Project facts

Canonical nameJim Bridger
Queue ID8066_2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyGas
Capacity586.2 MW
StateWyoming
CountySweetwater
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1975-12-01
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.