Johnston County 345 kV Substation (GEN-2020-015)

Johnston County 345 kV Substation is a 104.0 MW solar interconnection project in Johnston, Oklahoma with a current status of withdrawn. It is proposed to connect at Johnston County 345 kV Substation.

104.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameJohnston County 345 kV Substation
Queue IDGEN-2020-015
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity104.0 MW
StateOklahoma
CountyJohnston
Point of interconnectionJohnston County 345 kV Substation
Requested (queue) date2020-04-19
Proposed in-service date2026-12-31
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata