Jones - PA 0429 (Rhodes South) (70170_429)

Jones - PA 0429 (Rhodes South) is a 3.0 MW solar interconnection project in Elk, Pennsylvania with a current status of active.

3.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameJones - PA 0429 (Rhodes South)
Queue ID70170_429
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPJM
TechnologySolar
Capacity3.0 MW
StatePennsylvania
CountyElk
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerCVE US PA Jones 429 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2026-10-012027-10-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata