Joplin - Silver Creek 161 kV (GEN-2022-149)

Joplin - Silver Creek 161 kV is a 250.0 MW battery interconnection project in Newton, Missouri with a current status of withdrawn. It is proposed to connect at Joplin - Silver Creek 161 kV.

250.0 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameJoplin - Silver Creek 161 kV
Queue IDGEN-2022-149
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity250.0 MW
StateMissouri
CountyNewton
Point of interconnectionJoplin - Silver Creek 161 kV
Requested (queue) date2023-02-17
Proposed in-service date2025-04-01
Operational date
Withdrawn date2023-10-02
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata