Jordan Dam (13_2)

Jordan Dam is a 25.0 MW other interconnection project in Elmore, Alabama with a current status of operational.

25.0 MWCapacity
OperationalStatus
SOCOMarket
OtherTechnology

Project facts

Canonical nameJordan Dam
Queue ID13_2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyOther
Capacity25.0 MW
StateAlabama
CountyElmore
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1929-01-01
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata