Jordanville Wind (0186)

Jordanville Wind is a 80.0 MW wind interconnection project in Herkimer, New York with a current status of withdrawn. It is proposed to connect at Porter-Rotterdam 230kV.

80.0 MWCapacity
WithdrawnStatus
EMarket
WindTechnology

Project facts

Canonical nameJordanville Wind
Queue ID0186
Statuswithdrawn
Source status0
MarketE
TechnologyWind
Capacity80.0 MW
StateNew York
CountyHerkimer
Point of interconnectionPorter-Rotterdam 230kV
Requested (queue) date2005-04-01
Proposed in-service date2011-09-30
Operational date
Withdrawn date
DeveloperJordanville Wind, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.