Joyce Substation (L0254)

Joyce Substation is a 9.0 MW other interconnection project in Clallam, Washington with a current status of operational. It is proposed to connect at Port Angeles-Sappho 115 kV Line.

9.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameJoyce Substation
Queue IDL0254
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity9.0 MW
StateWashington
CountyClallam
Point of interconnectionPort Angeles-Sappho 115 kV Line
Requested (queue) date2006-03-13
Proposed in-service date
Operational date2008-09-30
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata