Kanawha 138kV (V1-035)

Kanawha 138kV is a 53.0 MW other interconnection project in Fayette, West Virginia with a current status of withdrawn.

53.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameKanawha 138kV
Queue IDV1-035
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity53.0 MW
StateWest Virginia
CountyFayette
Point of interconnection
Requested (queue) date2009-04-30
Proposed in-service date2011-05-01
Operational date
Withdrawn date2013-01-14
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata