KCE NY 11 (0749)

KCE NY 11 is a 20.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Coldenham Substation 115kV.

20.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 11
Queue ID0749
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyOrange
Point of interconnectionColdenham Substation 115kV
Requested (queue) date2018-08-10
Proposed in-service date2019-02-28
Operational date
Withdrawn date
DeveloperKCE NY 1, LLC
Utility / transmission ownerCHGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.