KCE NY 34 (1317)
KCE NY 34 is a 13.0 MW battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at 13.8 kV Saugerties Substation.
13.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology
Project facts
| Canonical name | KCE NY 34 |
|---|---|
| Queue ID | 1317 |
| Status | withdrawn |
| Source status | 0 |
| Market | G |
| Technology | Battery |
| Capacity | 13.0 MW |
| State | New York |
| County | Ulster |
| Point of interconnection | 13.8 kV Saugerties Substation |
| Requested (queue) date | 2021-12-21 |
| Proposed in-service date | 2022-02-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | KCE NY 34, LLC |
| Utility / transmission owner | CHGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.