KCE NY 38 (1615)

KCE NY 38 is a 250.0 MW battery interconnection project in Columbia, New York with a current status of withdrawn. It is proposed to connect at Transco 115kV Churchtown substation bus.

250.0 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 38
Queue ID1615
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyColumbia
Point of interconnectionTransco 115kV Churchtown substation bus
Requested (queue) date2023-09-26
Proposed in-service date2024-07-31
Operational date
Withdrawn date
DeveloperKCE NY 38, LLC
Utility / transmission ownerTransco

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata