KCE NY 38 (C24-165)

KCE NY 38 is a 250.0 MW battery interconnection project in Columbia, New York with a current status of active. It is proposed to connect at Churchtown 115 kV Substation.

250.0 MWCapacity
ActiveStatus
FMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 38
Queue IDC24-165
Statusactive
Source status7
MarketF
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyColumbia
Point of interconnectionChurchtown 115 kV Substation
Requested (queue) date2024-09-16
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperKCE NY 38, LLC
Utility / transmission ownerTransco

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata