KCE NY 6 (0759)

KCE NY 6 is a 20.0 MW battery interconnection project in Erie, New York with a current status of operational. It is proposed to connect at Gardenville - Bethlehem Steel Wind 115kV Line #150.

20.0 MWCapacity
OperationalStatus
AMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 6
Queue ID0759
Statusoperational
Source status14
MarketA
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyErie
Point of interconnectionGardenville - Bethlehem Steel Wind 115kV Line #150
Requested (queue) date2018-09-06
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperKCE NY 21, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata