Kearsarge Grissom (70051_GRISS)

Kearsarge Grissom is a 4.0 MW solar interconnection project in Sullivan, New Hampshire with a current status of operational.

4.0 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameKearsarge Grissom
Queue ID70051_GRISS
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity4.0 MW
StateNew Hampshire
CountySullivan
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-09-01
Withdrawn date—
Developer—
Utility / transmission ownerKearsarge Grissom LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01operational_date—2026-09-01medium
2026-11-01proposed_online_date2026-09-01—medium
2026-11-01statusactiveoperationalhigh
2026-10-02proposed_online_date2026-07-012026-09-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata