Kelly - Ackley 115.0kV (J4069)

Kelly - Ackley 115.0kV is a 169.9 MW solar interconnection project in Marathon, Wisconsin with a current status of operational. It is proposed to connect at Kelly - Ackley 115.0kV.

169.9 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameKelly - Ackley 115.0kV
Queue IDJ4069
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity169.9 MW
StateWisconsin
CountyMarathon
Point of interconnectionKelly - Ackley 115.0kV
Requested (queue) date2025-10-03
Proposed in-service date2030-01-31
Operational date2030-01-31
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.