Kelso - Lutesville 345 kV Line Tap (J1107)

Kelso - Lutesville 345 kV Line Tap is a 200.0 MW solar interconnection project in Cape Girardeau County, Missouri with a current status of operational. It is proposed to connect at Kelso - Lutesville 345 kV Line Tap.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameKelso - Lutesville 345 kV Line Tap
Queue IDJ1107
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity200.0 MW
StateMissouri
CountyCape Girardeau County
Point of interconnectionKelso - Lutesville 345 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.